Projects

Active & Flagship

General Lansana Conté Stadium

UNDER CONSTRUCTION  

Overview

TACON is delivering the complete upgrading and modernisation of Guinea’s national stadium — a 14-category programme spanning structural, MEP, HVAC, roofing, finishes and lift installation, executed while keeping the venue operational. Mid-programme, the stadium hosted a presidential ceremony, demonstrating delivery under intense national pressure.

At a glance

Client:  Ministry of Sports, Republic of Guinea

Role:  Main contractor

Location:  Nongo, Conakry

Supervision:  Hamere SARL

Scope & impact

  • Structural & civil — Concrete works, roof structure, column extensions and demolition.
  • Building systems — Electrical & MEP, HVAC, plumbing & drainage, lift installation.
  • Finishes & external — Walling, plastering, tiling, parking, landscape and perimeter works.
  • National significance — A modernised flagship venue ready for international competition.

_____________________________________________________________________

Super Bobo Luxury Apartments

  IN DEVELOPMENT  

Overview

A landmark high-rise residential and mixed-use development on the Conakry waterfront. Two 30-storey towers deliver 176 premium residences, while a podium block adds a hypermarket, offices and 180 parking spaces. Super Bobo pioneers aluminium tunnel formwork in Guinea — positioning it as a demonstration project for national housing programmes.

At a glance

Developer:  TACON / Atlantic Habitats

Location:  Boulevard de Donka, Camayenne, Conakry

Configuration:  Two B+G+30 towers (176 units) + G+M+10 podium

Scope & impact

  • Residential towers — Two B+G+30 towers, 88 units each, reinforced-concrete shear-wall construction.
  • Podium & retail — G+M+10 block with hypermarket, offices and parking.
  • Amenities — Gymnasiums, spas, children’s pool, lounges and link bridges.
  • Innovation — Aluminium tunnel formwork for speed, precision and cost efficiency.

_____________________________________________________________________

Kansonyah City & GMD Olympic Stadium

  PLANNING  

Overview

Kansonyah City is a Vision-2040 new city integrating mixed-income housing, industrial and logistics zones, civic and healthcare facilities, green corridors and multi-modal transport — with major mangrove conservation built into the plan. Its flagship anchor, the GMD Olympic Stadium, is TACON’s chosen pilot for full BIM, clash detection and 4D scheduling.

At a glance

Project:  New-city master plan + flagship Olympic stadium

Total area:  16,598 ha (5,807 ha urban; 6,900 ha mangrove conservation)

Phase I:  5,000 affordable housing units (Years 1–7)

Scope & impact

  • Integrated city — Mixed-income neighbourhoods, industry, civic and healthcare facilities.
  • Sustainability — 6,900 hectares of mangrove conservation and green corridors.
  • Olympic anchor — The GMD Olympic Stadium as landmark and digital-delivery pilot.
  • National alignment — Linked to Guinea’s Simandou 2040 development programme.

_____________________________________________________________________

Cité 2040 — Coléah Waterfront

  IN DEVELOPMENT  

Overview

Cité 2040 is TACON’s vision for modern coastal living on Conakry’s Coléah seafront — residences, commercial space and public realm designed around the Atlantic. Developed with Atlantic Habitats, it advances TACON’s evolution from contractor into a long-term developer and asset owner.

At a glance

Developer:  TACON / Atlantic Habitats

Location:  Coléah seafront, Conakry

Type:  Mixed-use waterfront development

Scope & impact

  • Waterfront residences — Premium apartments oriented to the seafront.
  • Commercial & retail — Mixed-use space animating the development.
  • Public realm — A promenade and open spaces connecting the city to the coast.
  • Long-term value — A recurring-income asset anchoring TACON’s development portfolio.

_____________________________________________________________________

Portfolio
Ansoumanya Stadium

  DELIVERED SCOPE  

Overview

Design and construction of a comprehensive sports stadium with full auxiliary infrastructure — access roads, urban improvements and community areas — built to support long-term community use and youth sports development.

At a glance

Type:  Sports stadium facility

Focus:  Grassroots sports development

Includes:  Seating, changing rooms, amenities, access roads, landscaping

Scope & impact

  • Stadium facility — Seating, changing rooms and core amenities.
  • Auxiliary works — Access roads and surrounding urban improvements.
  • Youth & community — Talent-development platforms and social cohesion.
  • Urban integration — Long-term peri-urban development and well-being.

_____________________________________________________________________

Labé Stadium

  DELIVERED SCOPE  

Overview

A regional-standard stadium with spectator stands, full pitch development and drainage, utilities, parking, access roads, security and administrative spaces — supporting decentralisation and balanced national development.

At a glance

Type:  Regional-standard stadium

Location:  Labé, Republic of Guinea

Facilities:  Stands, pitch, drainage, utilities, parking, admin

Scope & impact

  • Stadium construction — Spectator stands with full pitch and drainage systems.
  • Core systems — Drainage, utilities and pitch infrastructure to competition standard.
  • Supporting works — Parking, access roads, security and administrative spaces.
  • Regional impact — Decentralised infrastructure and regional economic activity.

_____________________________________________________________________

CAN Village — Kankan

  DELIVERED SCOPE  

Overview

Dedicated accommodation and support infrastructure for Africa Cup of Nations participants — residential units for teams, officials and staff, with internal roads, full utilities and recreational facilities, designed to leave a lasting urban-housing legacy for Kankan.

At a glance

Event:  Africa Cup of Nations (CAN)

Location:  Kankan, Republic of Guinea

Scope:  Residential units, utilities, recreational facilities

Scope & impact

  • Accommodation — Residential units to international competition standards.
  • Infrastructure — Internal roads, water, power and sanitation systems.
  • Amenities — Dining halls, training areas and relaxation spaces.
  • Legacy — A long-term residential or institutional asset for the city.

_____________________________________________________________________

CAN Village — Labé

  DELIVERED SCOPE  

Overview

Integrated housing with full utility infrastructure, landscaping and security — built with modular or conventional methods and designed for post-event conversion into residential or mixed-use developments, delivering sustainable long-term value.

At a glance

Event:  Africa Cup of Nations (CAN)

Location:  Labé, Republic of Guinea

Approach:  Modular or conventional build, post-event conversion

Scope & impact

  • Housing units — Integrated housing to international event standards.
  • Utility systems — Electricity, water and waste management for all units.
  • External works — Landscaping, security, access roads and circulation.
  • Sustainable legacy — Adaptable for post-event residential or mixed use.
Pipeline

Projects under development, negotiation or financing facilitation:

ProjectTypeStatus
Hamdallaye–Sonfonia Corniche Nord RoadUrban highwayFinancing facilitation
Kankan Football StadiumStadium (export-credit framework)Under negotiation
200 MW Thermal Power PlantOwned power investmentProposal / project finance
Guinea Water & Sanitation programmeDesign-build (DFI)Targeted